Saturday, 11 August 2012
Kaffee Partner Headquarters
With this piece of corporate architecture, which was implemented in a very cost-efficient way, 3deluxe show that their preference for expressive design must not be contrary to economical construction. Within a design, planning and construction period of barely 20 months, a friendly and modern working environment could be realised for the about 300 employees of the medium-sized company.
Curved shaped ribbons on the façade, made of 150 individually fabricated white concrete elements, merge the three building parts of the headquarters to a harmonious ensemble. Their fluid outlines conceal the orthogonal grid of the buildings' concrete skeleton construction and lend the architecture an impression of dynamics.
No comments:
Post a Comment